The effort it takes to circumvent standard construction, and make the assembly functional and create predictable watertightness is greater than the effort to build to the industry standards.

“Predictable watertightness has a critical path.”

At California Consultants, we suggest standard construction assemblies that have been predictably watertight over the decades rather than building an experiment.

In short….waterproofing success begins at construction of the structure.

California Consultants has been in business for over 30 years, and in this time we have teamed up with developers and architects alike to design full enclosure waterproofing systems that are not only specific to each waterproofing manufacturer’s requirements, but also specific to each project—which in the end, will always take a tremendous burden off of the developer and architectural design team.

From the roof, breezeways, curtain walls, podiums and planters, to below grade structures, it is imperative to keep each element of a building dry. Whether it’s a single family residence built into a hillside or a 40 story high-rise in the center of a major metropolitan city, California Consultants can successfully design the best watertight building envelope system for every type of project.

Contact us today for a consultation

proactivela@gmail.com

Recent Posts

Redlining of Deck Edge Glass Rail Embedded Shoe

Complex Detailing to HideRecessed shoe railing at Deck Edge can be Challenging  Incorrect detailing will…

1 month ago

Results of Systems Approach vs. Improper Waterproofing Approach within New Construction

Result of Systems ApproachBuilding science has delivered overwhelming improvement in health, safety and durability of…

1 month ago

(SAM) Self-Adhered Membranes, Flashings and WRB’s

What does Self-Adhered Really Mean? Background of SAM’s / otherwise known as SAF (Self-Adhered Flashings)…

3 months ago

Building Structural Analysis

A building's structural integrity is the foundation of everything else: safety, longevity, performance, and value.…

5 months ago

Building Failure Investigation

When a building fails, whether through water intrusion, structural deterioration, envelope breakdown, or material defects,…

5 months ago

CA Consultants Barry Taheri Presenter at AIA East Bay Symposium

CA Consultants Principal, Barry Taheri was a presenter at the AIA East Bay Symposium on…

1 year ago